Commit Graph
2 Commits
Author SHA1 Message Date
bobbanandClaude Sonnet 5.5 3b31b16796 Service-level targets with error budgets, and quarterly and annual reports
Monitoring -> Service levels: a target (99.9 %) on an endpoint check, a server or an
integration, measured over calendar months. Shows the figure, downtime used, the
error budget left, and how the last six months went. 80 % of the budget used is a
warning and an overspent budget a critical alert. Endpoints are measured day by day,
servers and integrations to the minute from the audit log.

The report page gains Quarter and Year (same figures, with a Service levels section),
and two settings send the quarterly and annual report after the month that ends them.

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-21 22:20:07 +02:00
bobbanandClaude Sonnet 5.5 be6c5552bd Patch plans, a monthly report and new-port alerts
Patch plans (Updates -> Patch plans): updates on a schedule, one server at a time, each by an
ordinary update run, stopping at the first failure by default, silencing what depends on a
server while it is updated, with one message at the end.

Monthly report (Operations -> Monthly report, and optionally a message on a day of the month):
availability, incidents, updates, restore tests, backups and renewals for a calendar month,
printable. Backed by daily endpoint figures and a record of renewals.

New ports: the first report with ports is the baseline; a TCP port that begins listening later and
is not noted on the server's Ports card is a warning, cleared by Mark as expected.

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-19 23:16:14 +02:00