Service-level targets with error budgets, and quarterly and annual reports
Monitoring -> Service levels: a target (99.9 %) on an endpoint check, a server or an integration, measured over calendar months. Shows the figure, downtime used, the error budget left, and how the last six months went. 80 % of the budget used is a warning and an overspent budget a critical alert. Endpoints are measured day by day, servers and integrations to the minute from the audit log. The report page gains Quarter and Year (same figures, with a Service levels section), and two settings send the quarterly and annual report after the month that ends them. Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
This commit is contained in:
1 parent
31044b2b64
commit
3b31b16796
31 files changed
+7706
-61
No files matched your search
@@ -292,6 +292,8 @@ All gauges. The same table is checked by a test against what `/metrics` really s
|
||||
| `homelab_endpoint_response_milliseconds` | `name`, `kind` | How long it took to answer the last time. |
|
||||
| `homelab_endpoint_value` | `name`, `kind` | The number a value check last read from the answer (checks that judge a value only, and only when it is a number). |
|
||||
| `homelab_endpoint_certificate_days_left` | `name`, `kind` | Days until the certificate it shows expires (negative once it has). |
|
||||
| `homelab_service_level_target_percent` | `name`, `subject`, `type` | The availability a service-level target asks for. |
|
||||
| `homelab_service_level_availability_percent`, `homelab_service_level_error_budget_remaining_minutes` | `name`, `subject`, `type` | How available the thing has been so far this calendar month, and the downtime still allowed before the target is missed (negative once it is). Left out for a target with nothing recorded this month. |
|
||||
| `homelab_ups_on_battery` | `name` | 1 if the UPS has lost mains power and runs on its battery, else 0; left out for a UPS that has not been read in the last five minutes. |
|
||||
| `homelab_ups_battery_charge_percent`, `homelab_ups_runtime_seconds`, `homelab_ups_load_percent`, `homelab_ups_input_volts` | `name` | How full the battery is, how long it would last at the present load, how much of its capacity the load uses, and the mains voltage it sees — each left out when the UPS does not say. |
|
||||
| `homelab_heartbeat_up` | `name` | 1 if the job has reported in time and not said it failed, else 0; switched-off heartbeats are left out. |
|
||||
|
||||
Reference in new issue
Block a user